
Bathroom fitters in Birmingham and the West Midlands
Ecobuild fits bathrooms, shower rooms and wet rooms across Birmingham and the West Midlands, from the agreed strip-out and preparation through to fitting and finishing.
Plumbing, tiling and complete bathroom installations.
A bathroom project can require plumbing, electrical work, preparation, waterproofing, tiling, fitting and finishing. Ecobuild assesses the required scope, prepares the quotation and coordinates the appropriate people for each part of the installation.

What’s included
- Removing and disposing of the existing suite, tiling and flooring
- Adjusting or renewing hot, cold and waste pipework
- Electrical work needed for lighting, extraction and other agreed bathroom electrical items within scope
- Wall preparation, boarding and tanking where required
- Supplying and fitting the suite, shower, screen, taps and brassware
- Wall and floor tiling, grouting and silicone
- Boxing in, plastering, making good and skirting
If your job includes electrical work, we explain before quoting who will carry it out and how it will be certified. Notifiable electrical work must be done by an electrician registered with a competent person scheme, or approved through Building Control.
Ready to start your project?
Tell us what needs doing and where. We will review it and explain the next step. Nothing is agreed until you accept a written quotation.
Bathroom fitting in Birmingham and the West Midlands
We discuss how the bathroom is used, the planned layout and any access needs before quoting.
Ecobuild coordinates the required trades in the correct order. You contract with and pay Ecobuild, and we remain your point of contact.
Your quotation sets out scope, exclusions and supply responsibilities, and any variation is agreed in writing before extra work proceeds.
About bathrooms and wet rooms
What a bathroom fit includes
A bathroom is several trades working in a small room, in the right order. We strip out, deal with plumbing and electrics, prepare the walls and floor, fit the suite and furniture, tile, seal and make good.
Your quotation says which of these are included for your job and which are not, so you can see where the line falls.
- Strip-out and removal of the old room
- First-fix plumbing, including moving waste and supply where the layout changes
- Electrics for lighting, shaver points, extractor and heating
- Floor and wall preparation, including boarding and levelling
- Tanking where the room needs it
- Suite, brassware, screen and furniture
- Tiling, grouting and sealing
- Ventilation ducted to outside
- Making good and clearing away
Types of bathroom we fit
- A refit in the same layout. The old room out, the new one in, pipework largely where it was.
- A reconfiguration. Moving the bath, basin or WC, which means moving waste runs and lifting the floor.
- A shower room or en suite. Often a small space where the extractor, the door swing and the drainage fall matter more than the fittings do.
- A wet room, where the floor itself is the drainage. See the tanking section below.
- An accessible bathroom. Level access, a seat, grab rails fixed to something solid, a slip-resistant floor and space to turn.
- A rental refit. Hard-wearing, easy to clean, simple to repair, and specified so the same parts can be sourced again in two years.
Planning your bathroom
Decide how the room will be used before choosing what goes in it. A few questions settle most of the layout.
- Bath or shower, or both? Families with small children usually want a bath; two adults in a hurry want a bigger shower. Removing the only bath can affect what buyers and tenants expect.
- Where does the water go? Waste runs need a fall, and that is the thing most likely to limit where a WC or a shower can move to.
- How will the room dry out? An extractor sized for the room and ducted outside, not into a loft, keeps paint on the ceiling and mould out of the grout.
- What is heating it? A towel rail looks right but may not heat the room on its own. Worth settling before the radiator comes off the wall.
- Storage. Most bathrooms are short of it, and a vanity unit, mirrored cabinet or recessed shower niche is easier to allow for now than later.
- Lighting. Bathroom fittings have to suit the zone they sit in, and one pendant in the middle of the ceiling rarely lights a mirror well.
- Who uses it. Basin height, which side the screen opens and where a rail goes are easier to design in than to retrofit.
Wet rooms and tanking
A wet room works because the floor is waterproof and sloped, not because the shower has a tray. That is most of the job.
The floor is formed to fall towards the drain, with a pre-formed tray set into it or by building the fall. Floor and lower walls are then tanked: a waterproof membrane bonded over the substrate and taken up the walls, with reinforcing tape at every internal corner and around the drain and any pipe penetration.
Tiles go on top of that membrane. The tiles and the grout are not the waterproofing, and that is the most common misunderstanding about wet rooms.
On a timber floor the movement matters as much as the water. Boards that flex crack grout and eventually tiles, so the floor usually needs stiffening or overboarding first.
Electrical work and Building Regulations
Bathrooms have their own rules because water and electricity share a small room. Fittings have to suit the zone they sit in, and new circuits or consumer unit work are normally notifiable, so the work has to be signed off.
If your job includes electrical work, we explain before quoting who will carry it out and how it will be certified. Notifiable electrical work must be done by an electrician registered with a competent person scheme, or approved through Building Control.
Replacing a bathroom like for like does not usually need a Building Regulations application. Changing the room’s use, taking new drainage outside, altering ventilation or affecting structure can. We will tell you what applies before you accept a quotation.
What affects the price
- Whether the layout changes. Keeping the suite where it is avoids the most expensive part of the job.
- The floor. Lifting a timber floor to move waste, or breaking into a solid floor, is a different job from working on top of it.
- Tiling. Area, tile size and pattern all change the time. Large-format tiles need a flatter wall; mosaics need far more grouting.
- Tanking. Needed for a wet room, sensible inside a shower enclosure, not needed across a whole room.
- What you have chosen. Suites, brassware and screens span a wide range, and we will fit items you supply yourself.
- What is behind the old room. Rotten floors, failed plaster and tired pipework only appear once it is stripped out.
Common questions
Can I supply my own suite?
- Yes. Tell us at enquiry so the quotation is fit-only for those items. Check what is in the boxes when they arrive and keep everything until the day: missing or damaged parts are the most common reason a bathroom stops halfway through.
Will I have a working toilet while the work is going on?
- Usually for most of it, but not for all of it. We will tell you which days to plan around before we start. If it is the only WC in the house, say so at enquiry, because it changes the order we work in.
Wet room or walk-in shower?
- A walk-in shower with a low tray gives you most of the look with less work and less that can go wrong. A wet room earns its extra cost when you want genuinely level access, or the room is too small for a tray that works properly.
Can you fit an accessible bathroom, and is there funding for it?
- We fit level-access showers, grab rails fixed to solid fixings, slip-resistant floors and raised WCs. Councils run Disabled Facilities Grant funding for adaptations, which you apply for through your own council and which normally needs an assessment first. We can quote for work you are seeking funding for, but the application is yours to make.
Do you work for landlords and letting agents?
- Yes. Tell us it is a rental at enquiry and we will specify for wear and for repairability, and work around tenancy dates where we can.
One
Contract with Ecobuild
Written
Quotations and exclusions
Agreed
Changes before extra cost
Homes
Landlords and commercial
Ready to discuss your project?
Tell us about your bathroom project and we will review the scope and next step with you.
If something is not right after we finish, tell us and we will come back and inspect it. See our terms and conditions for how this works.