
Kitchen fitters in Birmingham and the West Midlands
Ecobuild fits kitchens across Birmingham and the West Midlands, and manages the plastering, electrics, plumbing and joinery the installation depends on.
Kitchen fitting
Kitchen projects often involve more than fitting cabinets. Depending on the design, the work may include removal, plumbing, electrical work, plastering, flooring, tiling and decoration. Ecobuild defines the scope, prepares the quotation and coordinates the required sequence.

What’s included
- Removal and disposal of existing units, worktops and appliances
- Fitting carcasses, doors, drawers and handles
- Worktop templating, cutting and fitting including upstands
- Appliance integration: hob, oven, dishwasher, extractor
- Plumbing for sink, dishwasher and washing machine
- If gas work is needed, we explain how it will be arranged before quoting
- Electrical work included in the agreed design
If your job includes electrical work, we explain before quoting who will carry it out and how it will be certified. Notifiable electrical work must be done by an electrician registered with a competent person scheme, or approved through Building Control.
Ready to start your project?
Tell us what needs doing and where. We will review it and explain the next step. Nothing is agreed until you accept a written quotation.
Kitchen fitting in Birmingham and the West Midlands
We confirm whether the project is fit-only, customer-supplied or mixed-supply before finalising scope.
Your quotation identifies dependencies around deliveries, services and third-party inputs.
You contract with and pay Ecobuild. We coordinate the install sequence and agree any layout or scope changes in writing before additional costed work proceeds.
About kitchen fitting
What a kitchen fit includes
Fitting a kitchen is joinery, plumbing, electrics and decoration in a sequence, and the sequence is what keeps it to time. We strip out, run or move services, prepare the walls and floor, build and level the units, fit worktops, connect appliances, tile and make good.
Your quotation says which of these we are doing and which you are arranging, so there is no gap between the two.
- Strip-out and removal of the old kitchen
- Moving or adding sockets, lighting and appliance supplies
- Plumbing for sink, dishwasher and washing machine, including waste
- Wall and floor preparation, including plastering and levelling
- Assembling, fitting and levelling units
- Worktop templating and fitting
- Appliance installation and connection
- Splashbacks, tiling and sealing
- Flooring, where it is in the scope
- Making good and clearing away
Fit-only or supply-and-fit
Both work. The difference is who is responsible when something is missing.
With supply-and-fit, we price the units, worktops and labour together and we deal with anything that arrives damaged or short. With fit-only, you buy the kitchen and we fit what you have bought. That often saves money, particularly during a retailer sale, and it puts the delivery, the missing hinge and the wrong door colour on you to sort out.
If you are going fit-only, give us the plan and the parts list before you order. It is the cheapest hour of the whole job: it is where wrong carcass sizes, missing end panels and a sink that will not fit the unit under it get caught while they can still be changed.
Kitchen layouts that work
Most kitchen frustration is layout, not finish. Keep the sink, the hob and the fridge within easy reach of each other, and keep worktop either side of the hob and the sink so there is somewhere to put a hot pan and a wet pot.
- Galley. Two facing runs. Efficient in a narrow room, but doors and appliances have to open without meeting each other.
- L-shaped. Suits a room that also has a table in it, and gives a natural run between sink and hob.
- U-shaped. The most worktop for a given floor area, provided the room is wide enough that the corners stay usable.
- Island. Needs real width: allow room to walk and to open the dishwasher behind someone standing at the island. An island that takes services is a bigger job than one that does not.
- Peninsula. An island with one end attached, which often fits where a full island will not.
Gas, electrics and water
A kitchen is the heaviest electrical load in most houses, so the circuits matter. Appliance supplies, extra sockets, under-cabinet lighting and any work at the consumer unit need to be planned before the units go on the wall, not improvised afterwards.
If your job includes electrical work, we explain before quoting who will carry it out and how it will be certified. Notifiable electrical work must be done by an electrician registered with a competent person scheme, or approved through Building Control.
If your kitchen needs gas work, tell us when you enquire and we will explain how it will be arranged.
On water, the thing worth checking early is pressure. A new tap or a bigger sink can show up a supply that was always marginal, and that is better known before the old kitchen is out.
Open-plan and structural work
Taking a wall out between a kitchen and a dining room is a structural job, not a decorating one. If the wall is holding anything up, it needs a beam sized by a structural engineer, proper bearing at each end, and Building Regulations sign-off. We arrange the engineer as part of the job.
It also changes things that are easy to overlook. Removing a wall removes radiators and sockets, alters how the room heats and sounds, and takes away the door that used to keep cooking smells out of the sofa. Where the old wall met the ceiling and floor will need making good, and that line is usually visible unless it is dealt with properly.
We will tell you what your wall is doing before you commit to the idea, and quote the structural work as its own stage so you can see what the open plan actually costs.
What affects the price
- Whether services move. Keeping the sink and the hob where they are is the single biggest saving available.
- The units. Rigid-built carcasses, drawer boxes and soft-close gear cost more than flat-pack and last longer.
- The worktop. Laminate is fitted on site. Stone and composite are templated after the units are in and fitted on a separate visit, which adds a stage to the job.
- The appliances, and whether they are integrated. Integrated units need doors, housings and ventilation allowed for.
- The state of the room. Walls out of true, floors out of level and old plaster all have to be dealt with before units can be hung straight.
- Structural work, if a wall is coming out.
- Flooring, and whether it goes under the units or up to them.
Common questions
Will you fit a kitchen I bought somewhere else?
- Yes, that is a fit-only job. Send us the plan and the parts list before you order and we will tell you what looks wrong while it can still be changed.
Which worktop should I choose?
- Laminate is the cheapest and much better than it used to be, but a burn or a deep scratch cannot be repaired. Solid wood looks warm and can be sanded back, but it needs oiling and does not enjoy standing water around the sink. Quartz and other composites are hard, consistent and need templating after the units are fitted. Granite is similar but each slab differs, so see the actual slab. Sintered stone takes heat best and costs the most to work.
Do I need an electrician for a new kitchen?
- Almost always, because kitchens need dedicated appliance supplies and usually extra sockets and lighting. We explain before quoting who will do that work on your job and how it will be certified.
Can I take the wall down between my kitchen and dining room?
- Usually, but it depends on what the wall is doing. If it is load-bearing it needs a beam sized by a structural engineer and Building Regulations sign-off, and we arrange the engineer. We will tell you which kind of wall you have before you plan around it.
Do you fit kitchens in rental properties?
- Yes. Tell us it is a rental at enquiry and we will specify for wear and for parts that can be replaced individually rather than as a set.
One
Contract with Ecobuild
Written
Quotations and exclusions
Agreed
Changes before extra cost
Homes
Landlords and commercial
Ready to discuss your project?
Share your kitchen plans and we will confirm the best next step for your property.
If something is not right after we finish, tell us and we will come back and inspect it. See our terms and conditions for how this works.