House extensions in Birmingham and the West Midlands
Ecobuild manages house extensions and loft conversions across Birmingham and the West Midlands, divided into clear stages with one route for decisions.
Extensions and loft conversions
An extension or a loft conversion usually needs drawings, structural calculations, approvals, groundworks, building work and internal finishing. We arrange the right specialist for each of those, set out the scope we will build to, and coordinate every stage.

What’s included
- Rear and side-return extensions
- Dormer and hip-to-gable loft conversions
- Garage and outbuilding conversions
- Open-plan structural changes with the required steelwork
- We coordinate the agreed inspections and keep the paperwork together
- Project coordination from groundworks to decoration
- Structural calculations included in the agreed scope
If your job includes electrical work, we explain before quoting who will carry it out and how it will be certified. Notifiable electrical work must be done by an electrician registered with a competent person scheme, or approved through Building Control.
Ready to start your project?
Tell us what needs doing and where. We will review it and explain the next step. Nothing is agreed until you accept a written quotation.
Extensions and loft conversions in Birmingham
Before quoting, we go through the drawings and reports you have, and what still needs confirming.
Your scope is defined with clear inclusions, exclusions and dependencies for delivery planning.
You contract with and pay Ecobuild. We coordinate each stage, and where relevant identify owner responsibilities such as Building Regulations routes and Party Wall etc. Act notifications.
About extensions and loft conversions
Types of extension
What suits your house depends on the plot, the layout and where the light comes from.
- Single-storey rear. The usual way to a bigger kitchen or kitchen-dining room. Watch the light: a deep rear extension can leave the original room dark.
- Side return. Fills the narrow strip beside the back addition on a period terrace. Adds less area than people expect, but reshapes the kitchen.
- Wraparound. A rear and a side return together: the most useful ground-floor change open to a terrace, and the most involved.
- Two-storey. Adds a bedroom above the new ground floor. Cheaper per square metre, because one set of foundations and one roof serve two floors.
- Over-structure. Building above a garage or addition. The question is whether the foundations and walls will carry it, which needs checking first.
- Garage conversion. Often the cheapest space to gain, as the shell exists. The floor, walls and roof have to come up to habitable standard.
Types of loft conversion
Whether a loft can be converted comes down to head height, the roof structure and where the stairs can go. Measure the height under the ridge first: it is the one thing that cannot be changed without rebuilding the roof.
- Rooflight conversion. The roof shape is unchanged and windows sit in the plane of the roof. Only works where the head height is already there.
- Dormer. A box built out from the rear slope for standing height and usable floor area. The most common conversion on a terrace or semi.
- Hip-to-gable. The sloping end of a hipped roof is built up square, turning an unusable corner into room. Often paired with a rear dormer.
- Truss or cut roof. A traditional cut roof can usually be opened up with new structure. A modern trussed roof cannot have its timbers cut, so the structure is replaced as part of the job.
What is included, and who arranges it
We build, and we coordinate the trades the build needs: groundworks and foundations, structure and brickwork, roofing and weatherproofing, windows and doors, first-fix and second-fix services, plastering, joinery and decoration.
Drawings and structural calculations sit alongside that, and we arrange the right specialist for them. Tell us what you already have when you enquire, whether that is a full set, a sketch or nothing at all, and your quotation will say what we are arranging and what is already covered.
Your quotation then sets out the stages, what each includes and excludes, and anything that depends on opening up the ground or the structure.
Getting the most from the space
The extensions that work are the ones where the old house and the new part are planned together.
- Light into the middle. Rooflights, a glazed link or a well-placed internal opening are the usual answers, and all three affect the structure, so decide early.
- Where the walls come out. Every wall you remove was doing something: holding up a floor, carrying a radiator, keeping noise and smells in one place.
- Heating the new space. A bigger room with more glass is not served by the old radiator. Underfloor heating is easy while the floor is open and awkward afterwards.
- Insulation and airtightness. Only straightforward while the structure is open, and the difference between a room you use all year and one you avoid.
- Drainage. New build often crosses existing drains, and building near or over a public sewer needs an agreement with the water authority. Better known before the dig.
- Where the outside goes. An extension takes garden, so the space left and the way out to it belong in the design.
Planning permission and permitted development
Some house extensions can be built under permitted development, with no planning application, provided they stay within limits on size, height, position and materials. Many cannot. The limits are specific enough to check against your property rather than assume from a neighbour.
Several things remove or reduce those rights. Flats and maisonettes have none. Conservation areas and Article 4 directions restrict them. Listed buildings need listed building consent whatever else applies. And a previous owner’s extension may already have used the allowance up.
Where permitted development does apply you can ask the council for a lawful development certificate confirming it, which is not required but is useful evidence when you sell. Unless your quotation says we are handling them, applications and fees are yours and you are the applicant. We would rather raise a planning question early than meet it mid-build.
Building Regulations and the Party Wall etc. Act 1996
Building Regulations are separate from planning, and an extension needs them even when no planning application does. They cover structure, fire safety and escape, insulation, ventilation, drainage, electrical safety and stairs. A loft conversion turns on escape routes and stair geometry as much as on structure. Work is inspected in stages, and the sign-off is the document you will be asked for when you sell.
The Party Wall etc. Act 1996 applies separately again. It bites when you build on or into a shared wall, cut into it for a beam, or excavate close to a neighbour’s foundations, which covers most terrace and semi extensions. Notice has to be served, and the neighbour can agree or appoint a surveyor. It has its own timescales, so start early.
What affects the price
- The ground. Foundation depth follows what is underneath, nearby trees and existing drains, none of it fully known until it is dug.
- Size, and more importantly shape. Two storeys over one footprint cost less per square metre than one, because foundations and roof are shared.
- Glazing. Large sliding or bifold doors carry the cost of the units and of the steel above them.
- Roof type. A flat roof with rooflights, a pitched roof tied into the existing one and a lantern are three different jobs.
- How much of the old house is touched. Knocking through, moving a kitchen and making good the join are easy to underestimate.
- Drainage, sewers and access for machinery, especially where the only route to the garden is through the house.
- The finish. Two extensions of the same size diverge once flooring, joinery, lighting and decoration are specified.
Common questions
Do I need planning permission for an extension?
- Sometimes not, if it falls within permitted development, but that has to be checked against your property. Flats have no such rights, conservation areas and Article 4 directions restrict them, listed buildings need separate consent, and a previous extension may have used the allowance up.
Do I need a party wall agreement?
- Probably, if you are building on or into a shared wall, cutting into it for a beam, or excavating near your neighbour’s foundations. That covers most terrace and semi extensions, and the process has its own timescales, so raise it early.
Can you build over a drain?
- Often, with the right detailing, and sometimes a drain can be diverted instead. Building near or over a public sewer needs an agreement with the water authority. We check what runs through the site before the foundations are set out.
One
Contract with Ecobuild
Written
Quotations and exclusions
Agreed
Changes before extra cost
Homes
Landlords and commercial
Ready to discuss your project?
Tell us what space you want to create and we will review the right next step for your property.
If something is not right after we finish, tell us and we will come back and inspect it. See our terms and conditions for how this works.